Ma Kai, Director of the National Development and Reform Commission: Electricity prices will undergo gradual reform

In view of the current low marketization of resource prices in China, and the fact that the market supply and demand and resource scarcity cannot be truly reflected, Ma Kai, director of the National Development and Reform Commission, said at the resource price reform seminar on the 28th that the price of resources including electricity prices must adhere to the market. The reform orientation is based on the gradual reforms based on the affordability of all aspects.

"In the field of competitive potential, through the introduction of competition mechanism, relax the government's direct control of prices, let prices form in the market competition, give full play to the role of price signals to regulate market supply and demand, optimize resource allocation." Ma Kai said that part of the To form a competitive business link, we must strengthen and reform the government's price regulation and control to ensure the smooth operation of the market and national economic security. Overall design and step-by-step implementation are one of the basic principles of resource price reform. "Weighed the advantages and disadvantages of the pros and cons and the impact on the relevant parties, and actively and steadily promoted, and strive to minimize the negative impacts and uncertainties of the reform."

It is understood that relevant parties will actively promote electricity price reform, and gradually establish a price formation mechanism in which power generation and electricity sales prices are formed by market competition, and transmission and distribution prices are subject to government pricing, so that the on-grid tariffs are gradually transitioned from government formulation to market competition. . At the same time, the government should gradually dilute the intervention in the formation of coal prices and fully realize the marketization of coal prices. On the basis of researching and establishing a scientific cost accounting system, comprehensively reflecting the cost of coal resources, production costs and environmental costs, the coal-electricity price linkage mechanism is improved, and the benign interaction of coal-fired electricity prices is realized through market-based methods.
The authenticity of this information has not been confirmed by the international electrical network, for your reference only.

182mm Mono Solar Panel

From the upgrade of the existing 158.75 and 166 production lines, the process span of 182 solar panels is smaller, and the existing equipment and processes are more mature. Therefore, the difficulty and cost of new or upgraded production lines are lower, and the product yield rate is currently normal. PV industry experts suggest that the advantage of 182mm is that the industrial ecology is more mature, and it is the optimal size silicon wafer that meets the current development level of upstream and downstream, and is the first choice at this stage.


Sunket 182mm Solar Panel use 182mm 10BB/11BB Solar Cell, increases the wafer size, optimizes the layout profoundly and decreases the invalid power generation area.


1.Half Cell Technology

The half-cut cell design can decrease the power loss by the shadow effectively. The optimized circuit design not only realizes the maximum power output but also assures the reliability of solar panels.


2.MBB Technology

Sunket 182mm Solar Panel adopts multi-busbar technology. More busbars of the cell decrease the current transverse propagation path by 50%, effectively reduce the internal loss, and improve power of solar panels.


182mm Solar Panel,Mono Solar Panel,182mm Mono Solar Panel,Solar PV Module,Solar Panel

Wuxi Sunket New Energy Technology Co.,Ltd , https://www.sunketsolar.com

This entry was posted in on