





FAQ:
Q1. Are you a factory? Where is your factory?
A: Yes, 100% sure we are a factory, not a trading company. Our factory locate in Baiyun District, Guangzhou, mainland China.(close to Baiyun International Airport.about 20 minutes' drive)
Q2. What about the lead time?
A:Normally, 2-3 working day for sample order, 2-3 weeks for bulk order, we'll reply the delivery time order by order.
Special arrangement for special order and urgent order.
Q3. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q5. What's the payment method you accept?
A: Usually by T/T, L/C or other payment terms
Â
Q6. Can I add my logo on the products?
A: Yes,You can print LOGO free of charge
Q7: Do you offer guarantee for the products?
A: Yes, we offer 2-5 years warranty to our products.
Q8: How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system and the defective rate will be lessÂ
than 0.2%.
Secondly, during the guarantee period, we will send new lights with new order for small quantity. ForÂ
defective batch products, we will repair them and resend them to you or we can discuss the solution i
ncluding re-call according to real situation.
Â
HDG poles can be designed to encircle existing structures with ease and facilitate future expansion or retrofitting. HDG steel poles are self-conducting and thus have no need for a full-length copper grounding wire, and they can either be embedded or have an anchor base, and do not require fastener retightening due to pole shrinkage.
Yixing Futao Metal Structural Unit Co. Ltd. is com manded of Jiangsu Futao Group.
Steel Pole, Steel Light Pole, Steel Power Pole, Steel Tubular Pole,HDG Steel Pole
YIXING FUTAO METAL COMPONENT UNIT CO.,LTD , http://www.chinasteelpole.com